The requirement in our words, the evidence an assessor asks for, the common gaps and what to do before publication.
Open the registerThe report records the test house and the test, the barrier and its foundation, the test vehicle and its condition, the impact conditions and geometry, the measurements and the outcome, and a summary of results. It also records any optional assessment, such as pedestrian intruder access or occupant injury, if one was included.
Last updated: . Written from the public record and the published base standard. Not legal advice; does not certify.
The report has to describe the barrier and the foundation that were tested, with drawings, so that the tested article can be recognised on site. Clause 5.2 makes conformity between the tested article and its documentation a condition of the rating.
The report has to identify the vehicle, its class, its mass and its condition, and state the speed, the angle and the geometry. Those are the conditions that make the rating comparable with a site.
The report has to record the penetration, the debris and what happened to the vehicle. The clause 4 outcome is one of three: stopped at the line, redirected to the unprotected side, or halted beyond the line and unable to drive on.
A summary, a certificate or a one-line rating is not the report. It can be a cover sheet, but the buyer needs the report, the drawings and the raw measurement record to defend the rating.
No. It is a commercial document. The buyer should hold it, and the assurance statement should say what can be shared with a customer or an insurer.
There is no page count. A full report with drawings, calibration records and measurement sheets is normal. A two-page certificate is not a report.
Check the edition, the test house, the vehicle class and the foundation. A report to another standard or edition is not an ISO 22343-1 report, and a translation should be checked against the original.
Run the free scope check / Open the register / The kit and the watch
Every clause answer on this site points to the official record or the public preview behind it, so you can check any line yourself. The register holds 25 records, 111 evidence lines and 100 common failure lines. The dates come from the ISO stage record. The amendment text is not public, and this site does not describe what it changes.
The requirement in our words, the evidence an assessor asks for, the common gaps and what to do before publication.
Open the registerAnnex A is normative and carries the measurement controls. Annexes B to D are informative and say so.
Open the annexesStage 50.00 is recorded on 8 October 2026. The planning date is an estimate and is labelled wherever it appears.
Read the recordThe base standard is published. The amendment text is not public at FDIS. Each record cites the public source it comes from. Where the public record is silent, the page says so.