Dated plan

A twelve-week path to the evidence pack

The plan below is the order the standard expects. It is a default, not a promise: a single site can compress it and an estate with many barriers will extend it. The dates are relative to your start, and the planning date of 15 February 2027 is an estimate for the amendment, not a deadline for you.

The page adds the calendar dates for week 1 and week 12. With JavaScript off, the relative labels still work.
WhenClauseWhat is producedOwner
Week 0Clause 1 and 3Inventory every barrier, its function, its site and the claim made for itSecurity lead
Week 1Clause 1 and the ISO recordEdition register: the edition cited in each specification and contractCompliance lead
Week 2Clause 6.8Collect the full test reports, drawings and raw data for every barrierProcurement
Week 3Clause 7.2Decode every rating into the eight parts and check the editionSecurity engineer
Week 4Clause 6.5 and Table 2Compare the tested vehicle class and mass with the site threatRisk lead
Week 5Clause 5.2 and 6.4Compare the tested foundation and fixing with the as-built installationSite engineer
Week 6Clause 6.3 and 4Check the site angle, stand-off, penetration and debris against the ratingSecurity engineer
Week 7Annex CWalk the post-impact access and add it to the emergency planSite operator
Week 8Clause 8Write the one-page assurance statement with the edition, rating and report dateCompliance lead
Week 9Annex DSet the inspection and maintenance regime, with an owner and intervalFacilities
Week 10Amendment recordSend the supplier letter and set the amendment readiness dateProcurement
Week 11AllTabletop review with legal, insurance and operations, and sign-off of the packCISO

Print this page for the project wall. The paid kit carries the same plan with an editable date, an owner column and a status column per line.

THE ORDER

Why the plan starts at the inventory

Clause 1

The inventory comes first because a claim can only be checked against a named barrier and a named site. The report comes before the rating decode because the code is a summary of the report. The foundation comparison comes before the assurance statement because a rating that does not match the installation is not an assurance. The amendment readiness work comes last because it changes the wording of the claim, not the evidence behind it.

THE RECORD THIS IS BUILT FROM

Read from the public record, not invented

Every clause answer on this site points to the official record or the public preview behind it, so you can check any line yourself. The register holds 25 records, 111 evidence lines and 100 common failure lines. The dates come from the ISO stage record. The amendment text is not public, and this site does not describe what it changes.

16 CLAUSES

One page per clause

The requirement in our words, the evidence an assessor asks for, the common gaps and what to do before publication.

Open the register
9 ANNEX RECORDS

Normative and informative, labelled

Annex A is normative and carries the measurement controls. Annexes B to D are informative and say so.

Open the annexes
ONE STAGE RECORD

No invented date

Stage 50.00 is recorded on 8 October 2026. The planning date is an estimate and is labelled wherever it appears.

Read the record

The base standard is published. The amendment text is not public at FDIS. Each record cites the public source it comes from. Where the public record is silent, the page says so.