DesignationISO 22343-1:2023/PRF Amd 1
Stage50.00, FDIS registered
Planning date, an estimate15 Feb 2027
Published todayISO 22343-1:2023
Labelled specimen

What a kit row looks like

This is a specimen, not your record. It shows three rows from the register with the columns the kit adds: the evidence, the owner, the status. The free pages show every clause in full; the kit adds the working columns and the consolidated files.

Specimen, not live data

ClauseRecordRequirement, in our wordsEvidenceOwnerStatus
4RequirementWhen tested under Clause 6, the barrier must stop the vehicle at the datum line, redirect it to the unprotected side, or halt it beyond the line so that it cannot drive on. Beyond 25 m there is no rating.Test report, post-impact photographs, penetration measurementSecurity leadOpen
6.8RequirementThe report records the test house, the article, the vehicle, the conditions, the results and the optional assessments, and closes with a summary of results.Full report, drawings, calibration records, raw mediaProcurementOpen
7.2RequirementThe classification code packs the barrier type, test type, mass, class, speed, angle, penetration and debris into one line. Every part changes the meaning.Decoded rating table, original string, report referenceSecurity engineerOpen

The plan sheet

WhenClauseWhat is producedOwnerStatus
Week 11Barrier inventory, edition register and the claim made for each barrierSecurity leadOpen
Week 37.2Decoded rating table with the class, angle, penetration and debrisSecurity engineerOpen
Week 88One-page assurance statement with the edition, rating and report dateCompliance leadOpen

The CSV headings

clause,title,kind,group,citation,requirement,evidence_categories,evidence_artefacts,probe,gaps,prepare,owner,status,due_date,evidence_pointer,source_url,retrieved_at

Buy the kit, USD 799 Read the free register

THE RECORD THIS IS BUILT FROM

Read from the public record, not invented

Every clause answer on this site points to the official record or the public preview behind it, so you can check any line yourself. The register holds 25 records, 111 evidence lines and 100 common failure lines. The dates come from the ISO stage record. The amendment text is not public, and this site does not describe what it changes.

16 CLAUSES

One page per clause

The requirement in our words, the evidence an assessor asks for, the common gaps and what to do before publication.

Open the register
9 ANNEX RECORDS

Normative and informative, labelled

Annex A is normative and carries the measurement controls. Annexes B to D are informative and say so.

Open the annexes
ONE STAGE RECORD

No invented date

Stage 50.00 is recorded on 8 October 2026. The planning date is an estimate and is labelled wherever it appears.

Read the record

The base standard is published. The amendment text is not public at FDIS. Each record cites the public source it comes from. Where the public record is silent, the page says so.