Open the registerIt applies to a passive, active, portable or linear barrier used to prevent hostile vehicular access to a site, where the barrier is tested by a single impact from an unmanned vehicle and penetration does not exceed 25 metres. It does not apply to a barrier that only controls traffic, and it excludes blast, ballistic impact, manual attack and control-system attack.
Last updated: . Written from the public record and the published base standard. Not legal advice; does not certify.
A bollard, a gate, a blocker, a wall, a planter, a bund or a ditch can be a vehicle security barrier if it is intended to stop a vehicle. An access barrier that only directs traffic is not. Write the intended function first, then choose the product.
The test is one impact by one test vehicle that no person drives. A performance rating is not awarded where the vehicle penetrates more than 25 metres beyond the datum line. A result beyond that limit is data, not a rating.
Slow-speed encroachment, slow-speed nudging and ramming, blast, ballistic impact, manual attack with a vehicle or with tools, electrical manipulation and any attack on the control system. Those need other methods and other evidence.
Write the scope note for each barrier: the function, the threat vehicle, the site, the edition and the exclusions you are not claiming. Then run the free check. If the answer is unsure, the check returns scope incomplete and names the question.
Only if it is intended to stop a hostile vehicle. A boom gate that controls paying customers is not a VSB. A host of bollards protecting a pedestrian area may be.
It covers the impact of a test vehicle that is not driven by a human being. It does not cover the vehicle's approach, its driver or a multiple-impact attack.
That is outside this standard. Keep the vehicle rating separate and use a blast standard for the blast claim. Do not let one rating stand for both.
Run the free scope check / Open the register / The kit and the watch
Every clause answer on this site points to the official record or the public preview behind it, so you can check any line yourself. The register holds 25 records, 111 evidence lines and 100 common failure lines. The dates come from the ISO stage record. The amendment text is not public, and this site does not describe what it changes.
The requirement in our words, the evidence an assessor asks for, the common gaps and what to do before publication.
Open the registerAnnex A is normative and carries the measurement controls. Annexes B to D are informative and say so.
Open the annexesStage 50.00 is recorded on 8 October 2026. The planning date is an estimate and is labelled wherever it appears.
Read the recordThe base standard is published. The amendment text is not public at FDIS. Each record cites the public source it comes from. Where the public record is silent, the page says so.